How do you choose a building contractor in Zanzibar?
Short answer: choose a contractor on evidence, not on the lowest total. Visit buildings they finished, ask the owners, compare itemised quotes for the same drawings, and sign a contract that links payments to finished stages.
Step 1: a shortlist
- Ask for recent projects similar to yours in size and type, and visit at least two.
- Talk to the owners: was the work finished on time, on budget, and are they still satisfied a year later?
- Check that the contractor is properly registered and can show the documents your project requires.
Step 2: comparable quotes
- Give every contractor the same drawings and the same written specification.
- Ask for itemised quotes: quantities, materials, labour, transport and waste, not a single figure.
- Look for what is missing. A low quote often leaves out foundations, waterproofing, services or finishes.
- Ask which items are provisional sums and how they will be settled.
Step 3: the contract
- A clear scope, the drawings and the specification attached.
- A programme with dates for each stage.
- A payment schedule tied to completed stages, with a part kept back until defects are fixed.
- A written procedure for changes: no change is built before its price is agreed.
- Responsibility for permits, insurance, site safety and cleaning.
Warning signs
- A large advance payment requested before any work.
- Refusal to itemise the quote.
- No finished project you can visit.
- Pressure to start without drawings or approvals.
Get a second opinion on the offers
Next123 reviews contractor proposals line by line. See Construction Consultancy.
Ask Next123 about your project
This article also answers
- How do I find a good builder in Zanzibar?
- How do I compare contractor quotes?
Sources
Please note. General information as of 21 October 2026, written from an architect’s point of view. It is not legal, tax or financial advice. Prices are estimates and rules change: confirm the position for your case with qualified professionals in Zanzibar and with ZIPA before you sign or pay.